Page 11 - Spring 2024
P. 11

NEW SOFTWARE STREAMLINES

          THE PROCESS FOR PLANNING

          SMALL POWER CONNECTIONS












          A trial led by UK Power Networks has tested an        The software, developed by Cambridge-based
          automated planning tool known as 1Streetworks         1Spacial plc., simplifies the traditionally labour-
          Software, designed to streamline the process for      intensive process of streetworks planning and
          planning small power connections.                     by allowing surveyors to quickly assess sites and
                                                                generate traffic management plans it has been
                                                                found to reduce planning times from hours to
                                                                minutes.

                                                                The software works by allowing users to map
                                                                out work locations, after which it automatically
                                                                generates site-specific traffic management plans.
                                                                This integration of mapping layers allows for rapid
                                                                approval of traffic management permits by local
                                                                highway authorities, potentially leading to fewer
                                                                required modifications.

                                                                The initial phase of the trial demonstrated a
                                                                significant reduction in the time required for
                                                                surveyors to create streetworks design plans,
                                                                cutting the average connection time for new
                                                                or altered power connections by a quarter at
                                                                approximately 300 roadworks sites in Surrey.

                                                                There is now a plan to undertake a broader
                                                                test in Kent with the aim of assessing the tool’s
                                                                applicability across different work streams within
                                                                UK Power Networks service areas.

                                                                Reference: ‘Could this automated Planning Tool speed up
                                                                Electrical Connections’, Electrical Review, February 22nd.


                                                                                                           11
          Subscribe to Electron here https://membermojo.co.uk/ie
   6   7   8   9   10   11   12   13   14   15   16